The electrical part of the SMALL HYDROPOWER STATION BEROUN

MALÁ VODNÍ ELEKTRÁRNA A RYBÍ PŘECHOD BEROUN MALÁ VODNÍ ELEKTRÁRNA A RYBÍ PŘECHOD BEROUN MALÁ VODNÍ ELEKTRÁRNA A RYBÍ PŘECHOD BEROUN
MALÁ VODNÍ ELEKTRÁRNA A RYBÍ PŘECHOD BEROUN

 

Účast v soutěžích
Competitions: Nomination for degree in competition Building of the year 2011
Awards Award of  State environmental fund of Czech Republic in competition
  Building of the year 2011
Abbreviation: SHPS & Fish pass Beroun
Street:  
Municipality: Beroun
District: Central Bohemia
Votes: 12713
Description:
   The subject of the work was building of new small hydropower station for utilization of energetic potential of the river Berounka on the existing fixed weir in Beroun (35,564 km). The SHPS was built on the left bank of the river and the weir was rebuild into partially adjustable head weir. The SHPS is „run of the river“ type with automatic control of four semi-kaplan turbines driving directly coupled induction generators. The main control system keeps the regulated upper level by joint control of turbines in cooperation with six segment hydraulic weir flap regulation. Around the powerstation a new fish pass of natural resemblance type was built.
 
Typological class Technical infrasctructure (collectors, water treatment stations, exchange stations, power stations, waste disposal)
Category:  
Author: Deco Atelier
Ing. arch. Daniel Barták
Designer: HYDROKA s.r.o.
MÜRABELL s.r.o.
Supplier: Sdružení firem MVE a RP Beroun: Metrostav a.s. a Zakládání staveb, a.s.
Applicant: Metrostav a.s.
Investor: RenoEnergie, a.s.
Drawings:
  longitudinal section A-A
  Cross section C-C
  Cut water weir
  Overall situation
Last modified onSaturday, 05 December 2015 11:58