Účast v soutěžích |
Competitions: |
Nomination for degree in competition Building of the year 2011 |
Awards |
Award of State environmental fund of Czech Republic in competition |
|
Building of the year 2011 |
Abbreviation: |
SHPS & Fish pass Beroun |
Street: |
|
Municipality: |
Beroun |
District: |
Central Bohemia |
Votes: |
12713 |
Description:
The subject of the work was building of new small hydropower station for utilization of energetic potential of the river Berounka on the existing fixed weir in Beroun (35,564 km). The SHPS was built on the left bank of the river and the weir was rebuild into partially adjustable head weir. The SHPS is „run of the river“ type with automatic control of four semi-kaplan turbines driving directly coupled induction generators. The main control system keeps the regulated upper level by joint control of turbines in cooperation with six segment hydraulic weir flap regulation. Around the powerstation a new fish pass of natural resemblance type was built. |
|
Typological class: |
Technical infrasctructure (collectors, water treatment stations, exchange stations, power stations, waste disposal) |
Category: |
|
Author: |
Deco Atelier Ing. arch. Daniel Barták |
Designer: |
HYDROKA s.r.o. MÜRABELL s.r.o. |
Supplier: |
Sdružení firem MVE a RP Beroun: Metrostav a.s. a Zakládání staveb, a.s. |
Applicant: |
Metrostav a.s. |
Investor: |
RenoEnergie, a.s. |
|
|
Last modified onSaturday, 05 December 2015 11:58